MP News: Flaw or mistake in design? Direction of overbridge changed while being built, SDM ordered investigation to Bridge Corporation

MP News: Flaw or mistake in design? Direction of overbridge changed while being built, SDM ordered investigation to Bridge Corporation

In the pictures taken from the drone, this bridge appeared to be in a sharp turn of 90 degrees, due to which the local citizens have raised the issue of increasing the possibility of accidents. Residents say that construction was started without proper survey, due to which the direction of the bridge had to be changed.

Source link